September 2018

Nuuk Bridge Installation

Installation of the bridge in Nuuk, Greenland. Floating in Carrier 7 at high tide +4.7m and leaving the bridge on the supports when tide was 3.6m. During trip from Swinoujscie, Poland to Nuuk, Greenland, Herakles and Carrier 7 catched a storm for 3 days with 12m waves and wind 30m/s. Please see video from Herakles: https://www.youtube.com/watch?v=NY0d_yZxPFw

No items found.

The units from this article